Description: Chernobyl documents Hardware department of the 3rd stage of the Chernobyl nuclear power plant In this lot you are presented with 2 Magazines on the Topic of Chernobyl. 1. Journal of Concrete Works. Hardware department (Concrete Preparation) 3rd line..In the Journal of Concrete Preparation Calculations.There are seals signed by engineer V.T. Gore.Head of the construction laboratory A.T. Mirgorodsky2. Technical acceptance log. Hardware department. 3rd stage. Block A.There are approval signatures for the execution of work on the installation of concrete preparation.Stamp of the Chernobyl Nuclear Power Plant.